Again, vandals have attacked and caused significant disruption to the ongoing repair works on the Ahoada-Yenagoa 132kV line, the Transmission Company of Nigeria has reported. The fresh attacks, which occurred on November 19, 2024, affected Towers 29 to 31 and resulted in the theft of approximately one-third of the conductor. The latest incident is the