Bhubaneswar: The Khurda Road-Bolangir New Rail Line Project achieved a major milestone with the successful breakthrough of the tunnel located between Buguda and Banigochha in Nayagarh district, the East Coast Railway said. This 2.6-km-long tunnel, with a 2-degree curve, was completed through the New Austrian Tunneling Method (NATM) of excavation. The breakthrough, or “daylighting”, was […]