A trial run of a tower wagon was conducted on the India’s first cable-stayed railway bridge at Anji Khad. It will connect Katra and Reasi section of the Udhampur-Srinagar-Baramulla-Rail-Link (USBRL). Union Minister for Railways Ashwini Vaishnaw posted on X: “Trial run of tower wagon on India’s First Cable-Stayed Railway Bridge at Anji Khad for USBRL […]