The projects with a capacity of 100.1 Megawatts (MW) will be set up at Ballari Thermal Power Station (BTPS), Yermarus Thermal Power Station (YTPS) and Raichur Thermal Power Station (RTPS) at an estimated cost of ₹411.4 crore