The electric locomotive manufacturing unit at Dahod in Gujarat will start producing a sufficient number of high-speed freight train engines in another three years so that India can export them, Railway Minister Ashwini Vaishnaw said here on Saturday.
Vaishnaw, who was on a day-long visit to Gujarat, went to Dahod to review this yet-to-be fully functional manufacturing unit as well as the production status of the first 9000 horsepower (HP) engine from here.
He inspected the engine and said it will be ready to serve the Indian Railways in another few months.
The foundation stone of the unit at Dahod was laid in April 2022 by Prime Minister Narendra Modi with an estimated cost of Rs 20,000 crore.
According to the railways, increasing the speed of freight trains is a vital concern for which high horsepower and high-speed locomotives are required to be inducted.
"Hence, the Ministry of Railways had decided to manufacture 9000 HP high-speed freight locomotives, at Rolling Stock Workshop