Trains have started to serve Telford Central again, after a landslip near Oakengates closed the Wolverhampton to Shrewsbury line on 8 March. Network Rail engineers had discovered that 5,000 tonnes of material had slipped beneath 50 metres of the railway, after persistent heavy rain over the past few months had weakened the structure.