New Delhi, Nov 19: The installed renewable energy capacity (including large hydro) in India is projected to reach 250 GW by March 2026, from the level of 201 GW (as of September this year), according to a report on Tuesday. The capacity addition will be driven by the large project pipeline of over 80 GW, […]

The post India’s installed renewable energy capacity to reach 250 GW by March 2026 appeared first on The Shillong Times.