The minister stated that the government had decided to construct a 17-km RCC retaining wall along the Munneruriver bank at a cost of Rs 690 crore, and that 5.1 km of the available government land can be used for the construction of the wall on both sides towards the rural mandal and the other extent for 1.7 km towards Khammam urban