THE States of Guernsey commissioned a report on our flood risk by Royal Haskoning, which concluded in 2012 that several flood defences were required. In particular work was needed ‘with a high degree of urgency to address a very substantial risk of flooding from overtopping of the Bridge at the western end of St Sampson harbour’ as well as other necessary flood defences.