@@CollinGallant A second major wind farm proposal near the Hat is delayed as power companies worry that existing lines can’t carry their electricity out of the region. At the same time, Alberta’s grid operator suggests more than $3 billion in “near term” line upgrades are needed soon in southeast Alberta. And as a back-drop, the
The post $3B in line upgrades needed for power expansion appeared first on Medicine Hat News.